The Binational Fulbright Commission in Egypt, Three- month research grant at Coastal and Ocean Engineering Division, Department of Civil Engineering, Texas A&M University, Texas, USA.
International Training Workshop on Integrated Coastal Management in the Mediterranean, Black and Caspian Seas, 27 – 29 May 2015, Dalyan, Mugla, Turkey
Scholarship to participate in the 9th International Training Workshop on Integrated Coastal Management in the Mediterranean and Black Sea (MEDCOAST INSTITUTE 2012), Dalyan, Aegean Coast, Turkey between 25 September - 11 October 2012.
Course | Academic year | Term | |
---|---|---|---|
CB 761 W - Interaction of Coastal Structures and Shorelines | 2018 | Fall Semester | View All Content |
CB 766 - Ocean and Coastal Hydrodynamics | 2018 | Fall Semester | View All Content |
CB 767 - Coastal Processes and Design | 2018 | Fall Semester | View All Content |
CB585 - Design and Construction of Coastal Structures | 2013 | Fall Semester | View All Content |
- Lectures Notes | |||
CB483 - Irrigation and Drainage | 2011 | Fall Semester | View All Content |
CB281 - Hydraulics for Civil Engineers | 2011 | Fall Semester | View All Content |
Consulting Project
Start Date : 05 May 2013-05 May 2013
Container Quay Wall No. 100: Member of the committee to prepare the preliminary technical report for the new Quay Wall No. 100. The design documents include the general supplementary conditions, preliminary structural analysis, technical specifications, complete set of drawings, bill of quantity, cost estimation and calculation sheet.
Consulting Project
Start Date : 06 Jan 2013-06 Jan 2013
Developing of Quay Wall No. 96: Member of the committee to upgrade the existing Quay Wall No. 96 to increase the handling berthing depths from 16.0 meter to 26.40 meter. The design documents include the general supplementary conditions, structural analysis, technical specifications, complete set of drawings, bill of quantity, cost estimation and calculation sheet.
Consulting Project
Start Date : 01 Jan 2012-01 Jan 2012
Developing of OPC Platform:
Member of the committee to upgrade the existing OPC platform to increase the handling berthing ships from 3000 to 27000 DWT. The design documents include the general supplementary conditions, structural analysis, technical specifications, complete set of drawings, bill of quantity, cost estimation and calculation sheet.
Consulting Project
Start Date : 01 Jan 2007-01 Jan 2007
Development of Al-Areesh harbour, Egypt (2007):
Member of the technical committee, in participation with the Maritime Research and Consultation Center , to study the development of Al-Areesh harbour. The committee consists of Maritime Research and Consultation Center, ؛ort Said Port Authority and the head manager of Al-Areesh Port. The development plan consists of different phases movement of fish harbour, development of the western quay walls, and extension of the harbour include new breakwaters and new quay walls.
Consulting Project
Start Date : 01 Jan 2006-01 Jan 2006
Member of the committee, in participation with the Academy Center of Engineering Consultancy and Development, ACECD, to study the development of Port Said East Port A consulting consortium between Inros Lackner AG, Hamburg Port Consulting, and Academy Center of Engineering Consultancy and Development to tender for the study on the development of Port Said East Port and its hinterland.
Branch : AASTMT Branch, , Egypt
Fax : 002034829930
Mobile : 00201001708865
Email: Send Email
Location :