Jetty Construction for The Liquid Bulk of Sokhna Port | AASTMT Centers

Jetty Construction for The Liquid Bulk of Sokhna Port

Client : General Authority for the Suez Canal Economic Zone.

Location: El Sokhna - Egypt.

Date: Ongoing

Description:

• Review designs of the new jetty.
• Employer Advisor concerning the implementation of operations and providing technical reports and solving technical problems.
• Supervising the implementation of operations until the end of the project and primary delivery and the compliance with technical specifications standard.


 

Watch Video

List Of Projects

1.Jetty Construction for The Liquid Bulk of Sokhna Port. 

2.Tank Farm Construction for The Liquid Bulk of Sokhna Port .

3.New multi-purpose terminal berths 62-55 in Alexandria Port.

4.Consultancy services for dredging the waterway of Alexandria port– implementation stage .

5.Developing the northern port of Port Sudan .

6.consultancy services for designing and supervising on construction a multi-purpose berth, length of 400 m and a depth of 14 m, in Alexandria port (berth 85) .

 7.Designs and tender document for developing Hamrawein port .

8. Establishment, managing, operating and maintenance for Container terminal CT3 in Berth 100 in Dekhila port (BOT) .

9. Feasibilty study & Tender Documents for establishing multi purpose in Damietta port (BOT) .

10.Design, Tendering and Supervision of Port Said East Port Infrastructure .

11.  Port Said East Port Construction – Design and Tendering of the Quay Wall & Marine Works Construction – BOT Tender for Container Terminal Operation – Supervising the Construction .

12. A Feasibility Study & Design for The Entrance Side Channel at Port Said East Port .

13.A Feasibility Study & Design Trailers & Vehicles Parking Area at Port Said East Port .

14. Design and Tendering of the Quay Wall & Marine Works Construction of Port North Al-Sukhna

15.Development of North Quay Wall and Marin Works at Sherif Basin in West Port Said .

16. Preliminary Design for Sharm El-Shekh and El-Tor Ports .

17. Design and Tendering of Nuwaiba Port .

18. Planning and Developing of Arish Port .

19. Consultancy Works for Establishment of a Specialized Port for Holding Company for Carbon (CHC)

20. Execution of a Real Time Maneuvering Simulation for Port Said East Port (CHC) .

21.  A Study of The Evaluation and Developments of The Saudi Ports of Jubail Commercial Port, Yanbu Commercial Port, Jizan and Dhaba Ports .

22.  Restructuring of Technical Workshops of Coastal Guards – Saudi Arabia .

23. Environmental Improvement Strategy for Alexandria Port .

24. The Study of Re- planning and Development of Port Said Container Terminal .

25. Environmental Management System .

26. The Study of Re- planning and Development of Alexandria Container Terminal .