Port Said East Port Construction – Design and Tendering of the Quay Wall & Marine Works Construction – BOT Tender for Container Terminal Operation – Supervising the Construction Client: Ministry of Transport – The Maritime Transport Sector. Location: Alexandria - Egypt End Date: September 2001 Description: Approving the layout. Marine works Design. Quay Wall Design. Terms of References Preparation. Tendering. Evaluation. Supervising, the Construction. Terms of References for Container Terminal Operation (BOT). Tendering and Supervising the Operator’s Commitments. Participation approving the DHV master plan of Port Said east port. • Participation in Design Process. • Participation in Tender Document Preparation. • Participation in Tender Evaluation. • Participation in Supervisory Activities.
|