A Feasibility Study & Design for The Entrance Side Channel at Port Said East Port | AASTMT Centers

A Feasibility Study & Design for The Entrance Side Channel at Port Said East Port

Client: General Authority of Port Said Ports 

Location: Port Said - Egypt

End Date: April 2010

Description:

Due to the huge increase of the size of container ships consequently the number of containers handled, PSPA assigned the maritime research and consultant center to perform a Feasibility Study & design for a separate entrance channel to the Port Said Northern entrance (length 9 km-width 250m-depth 18.5).  The separate entrance channel will save the time wasted by container ships and other ship types at the port waiting area, until being permitted to enter within the Suez Canal convoy, the mentioned time saving will be reflected in cost savings for container ships and shipping lines as well as to the container terminals of the whole port area.
       • An Economic, technical feasibility study was prepared to establish an entrance channel.
       • Participation in design work.
       • Tender document preparation.
       • Evaluation of technical and financial proposals

 

List Of Projects

1.Jetty Construction for The Liquid Bulk of Sokhna Port. 

2.Tank Farm Construction for The Liquid Bulk of Sokhna Port .

3.New multi-purpose terminal berths 62-55 in Alexandria Port.

4.Consultancy services for dredging the waterway of Alexandria port– implementation stage .

5.Developing the northern port of Port Sudan .

6.consultancy services for designing and supervising on construction a multi-purpose berth, length of 400 m and a depth of 14 m, in Alexandria port (berth 85) .

 7.Designs and tender document for developing Hamrawein port .

8. Establishment, managing, operating and maintenance for Container terminal CT3 in Berth 100 in Dekhila port (BOT) .

9. Feasibilty study & Tender Documents for establishing multi purpose in Damietta port (BOT) .

10.Design, Tendering and Supervision of Port Said East Port Infrastructure .

11.  Port Said East Port Construction – Design and Tendering of the Quay Wall & Marine Works Construction – BOT Tender for Container Terminal Operation – Supervising the Construction .

12. A Feasibility Study & Design for The Entrance Side Channel at Port Said East Port .

13.A Feasibility Study & Design Trailers & Vehicles Parking Area at Port Said East Port .

14. Design and Tendering of the Quay Wall & Marine Works Construction of Port North Al-Sukhna

15.Development of North Quay Wall and Marin Works at Sherif Basin in West Port Said .

16. Preliminary Design for Sharm El-Shekh and El-Tor Ports .

17. Design and Tendering of Nuwaiba Port .

18. Planning and Developing of Arish Port .

19. Consultancy Works for Establishment of a Specialized Port for Holding Company for Carbon (CHC)

20. Execution of a Real Time Maneuvering Simulation for Port Said East Port (CHC) .

21.  A Study of The Evaluation and Developments of The Saudi Ports of Jubail Commercial Port, Yanbu Commercial Port, Jizan and Dhaba Ports .

22.  Restructuring of Technical Workshops of Coastal Guards – Saudi Arabia .

23. Environmental Improvement Strategy for Alexandria Port .

24. The Study of Re- planning and Development of Port Said Container Terminal .

25. Environmental Management System .

26. The Study of Re- planning and Development of Alexandria Container Terminal .