Design and construction of formwork systems - horizontal formwork - vertical formwork - Concrete technology - mixing and batching concrete - transporting concrete - placing and compacting concrete. Design and construction of dewatering systems - open sumps system ? well points system - deep wells system - Design and construction of shoring systems - continuous piles system - secant piles system - diaphragm walls system ? Cranes: derrick cranes - mobile cranes - tower cranes.
B.Sc. in Construction and Building Engineering 180 Cr.Hr.
Data will be available soon!
| content serial | Description |
|---|---|
| 1 | Week No.1: Loads on formwork. |
| 2 | Week No.2: Properties of materials used in formwork. |
| 3 | Week No.3: Strength and rigidity of forming systems. |
| 4 | Week No.4: Design of horizontal formwork systems. |
| 5 | Week No.5: Design of vertical formwork systems. |
| 6 | Week No.6: Design of special formwork systems . |
| 7 | Week No.7: Concrete (Batching and mixing). |
| 8 | Week No.8: Concrete (Transporting and pumping ). |
| 9 | Week No.9: Concrete (Placing , compacting and curing ). |
| 10 | Week No.10: Dewatering systems. |
| 11 | Week No.11: Shoring systems. |
| 12 | Week No.12: Shoring systems (cont.). |
| 13 | Week No.13: Diaphragm walls. |
| 14 | Week No.14: Cranes. |
| 15 | Week No.15: Health and safety in construction. |
| 16 | Week No.16: Final Exam. |